SCK.CEN lwrdeputy Contact: Marc Verwerft    
Logon    

Home


Participants

Work packages

Deliverables

Deliverables

Nr WP Title Date Nature Dissemination
Level
D01 WP 2
Design characteristics for the fuel pins (task 2.1)
January, 2007 Re PU  
D02 WP 2
Fabrication and fabrication report of the Fe-based CERMET fuel pellets (task 2.2)
January, 2008 O RE  
D03 WP 2
Fabrication and fabrication report of the Mo-based CERMET fuel pellets (task 2.2)
January, 2008 O RE  
D04 WP 2 Fabrication and fabrication report of the welded pins (all 4 pins) (task 2.2)
April, 2008 O RE  
D05 WP 4
Scope definition of performance and safety assessment for Th-Pu-MOX and metal-based Pu-IMF fuels in PWR and VVER (task 4.2)
April, 2008 Re PU  
D06 WP 3 Post-irradiation examination results including synthesis/analysis report (task 3.1)
July, 2008 Re RE  
D07 WP 3 Radiochemical analysis (task 3.2)
July, 2008 Re RE  
D08 WP 4
Report on "Introduction of innovative Pu-burning fuels in the nuclear fuel cycle" (task 4.1)
October, 2008 Re PU  
D09 WP 4
Report on definition and uncertainty analysis of Th-Pu-MOX-Benchmark (task 4.3)
October, 2008 Re RE  
D10 WP 4 Performance and preliminary safety assessment of Th-Pu-MOX and metal-based Pu-IMF in PWR and VVER (task 4.2)
April, 2010 Re RE  
D11 WP 4
Report on implementation and evaluation of the Th-Pu-MOX benchmark (task 4.3)
April, 2010 Re PU  
D12 WP 2 Irradiation report (task 2.3)
April, 2010 Re RE  
D13 WP 2 Non Destructive Testing reports (task 2.3)
April, 2010 Re RE  
D14 WP 3 Back-end studies on leaching behaviour and dissolution properties (task 3.3)
October, 2010 Re RE  
 


webmaster