| D01 |
WP 2 |
| Design characteristics for the fuel pins (task 2.1) |
|
|
January, 2007 |
Re |
PU |
|
|
|
| D02 |
WP 2 |
| Fabrication and fabrication report of the Fe-based CERMET fuel pellets (task 2.2) |
|
|
January, 2008 |
O |
RE |
|
|
|
| D03 |
WP 2 |
| Fabrication and fabrication report of the Mo-based CERMET fuel pellets (task 2.2) |
|
|
January, 2008 |
O |
RE |
|
|
|
| D04 |
WP 2 |
Fabrication and fabrication report of the welded pins (all 4 pins) (task 2.2)
|
April, 2008 |
O |
RE |
|
|
|
| D05 |
WP 4 |
| Scope definition of performance and safety assessment for Th-Pu-MOX and metal-based Pu-IMF fuels in PWR and VVER (task 4.2) |
|
|
April, 2008 |
Re |
PU |
|
|
|
| D06 |
WP 3 |
Post-irradiation examination results including synthesis/analysis report (task 3.1)
|
July, 2008 |
Re |
RE |
|
|
|
| D07 |
WP 3 |
Radiochemical analysis (task 3.2)
|
July, 2008 |
Re |
RE |
|
|
|
| D08 |
WP 4 |
| Report on "Introduction of innovative Pu-burning fuels in the nuclear fuel cycle" (task 4.1) |
|
|
October, 2008 |
Re |
PU |
|
|
|
| D09 |
WP 4 |
| Report on definition and uncertainty analysis of Th-Pu-MOX-Benchmark (task 4.3) |
|
|
October, 2008 |
Re |
RE |
|
|
|
| D10 |
WP 4 |
Performance and preliminary safety assessment of Th-Pu-MOX and metal-based Pu-IMF in PWR and VVER (task 4.2)
|
April, 2010 |
Re |
RE |
|
|
|
| D11 |
WP 4 |
| Report on implementation and evaluation of the Th-Pu-MOX benchmark (task 4.3) |
|
|
April, 2010 |
Re |
PU |
|
|
|
| D12 |
WP 2 |
Irradiation report (task 2.3)
|
April, 2010 |
Re |
RE |
|
|
|
| D13 |
WP 2 |
Non Destructive Testing reports (task 2.3)
|
April, 2010 |
Re |
RE |
|
|
|
| D14 |
WP 3 |
Back-end studies on leaching behaviour and dissolution properties (task 3.3)
|
October, 2010 |
Re |
RE |
|
|